HOME FIRM PROFILE PROJECTS CONTACT US
Academic
Commercial
Ecclesiastical
Food Service
Medical
 

Everett School District, Heatherwood Middle School


Project List Description
This was the first multi-story school to be built in the Everett School District in many years. It consists of over 120,000 square feet to house over 900 students.

The brick facades, private offices for the teachers, single loaded corridors and a central hub within the school that leads to all major areas, contributes to the stimulating atmosphere of the school. The external circulation for cars and buses is completely separate for safety.


"Mr. Andrew Hall was the primary architect for the project. Botesch, Nash and Hall were selected because they were a small local firm with health care construction experience with various size health care facilities. The same architect stayed with the project during design, bid, construction, and post construction activities."

C. Philip Sandifer
Administrator
Island Hospital

© 2003 · Botesch, Nash & Hall Architects, P.S. · 425-259-0868 · 425-774-3341 · info@bnharch.com